Astoria and Columbia River Railroad logo
Our Baldwin #21 at work
Baldwin #21
Tender
SP&S #273
Astoria RR
Work Photos
Early Photos
History
Events
Join
ARPA
Links
Contact Us
Home


Photo Journal

Caulking the Firebox Seam
Corry is caulking the seam between the new firebox and the mud ring.


Caulking the Firebox Seam

Saturday, December 11, 2010 by MC

In riveted steel boiler construction, caulking is the process of rendering a seam watertight by driving a thick, blunt chisel-like tool into the plate adjacent to the seam. This has the effect of displacing the metal into a close fit with the adjoining piece. We use a pneumatic hammer to caulk the boiler seams. It is a noisy and tiring process.

More Photo NEWS
 


railroad tracks
Astoria Railroad Preservation Association
P.O. Box 541
446 W. Marine Dr.
Astoria, Oregon 97103
(503) 325-5323
e-mail: info@astoriarailroad.org

An Educational Non-Profit Corporation
Dedicated to Promoting Public Awareness of Railroad History
Through the Preservation and Operation of Vintage Railway Equipment.


just a counter

design = cheth